Sri Indu Constructions is executing a 132/33KV substation project at Kadivedu along with associated transmission infrastructure. The project is aimed at improving regional power distribution efficiency and strengthening the existing grid network.
This project involves both substation construction and transmission line integration, requiring coordinated execution across civil and electrical disciplines.
The project is being executed using a structured EPC methodology ensuring seamless coordination between substation construction and transmission line works. Strict safety standards and quality controls are maintained throughout execution.
The project will enhance regional power reliability and distribution efficiency while showcasing Sri Indu Constructions’ capability in executing integrated substation and transmission infrastructure projects.