Sri Indu Constructions is executing a 400/220KV Gas Insulated Substation (GIS) project at Roorkee, Uttarakhand under EPC mode. The project is designed to strengthen regional transmission infrastructure and ensure reliable power distribution.
This high-voltage substation involves advanced engineering coordination, precision installation, and strict safety compliance to deliver long-term operational stability.
The project follows a structured EPC methodology integrating engineering, procurement, and construction with real-time monitoring. All phases are executed with strict quality control and safety measures.
The project enhances transmission reliability and capacity in the region while showcasing Sri Indu Constructions’ expertise in executing high-voltage infrastructure projects up to 400KV level.