Uttarakhand • PGCIL • Ongoing

Project Overview

Sri Indu Constructions is executing a 400KV LILO (Line In Line Out) transmission line project connecting the Puhana–Muzaffarnagar line to the proposed GIS substation at Roorkee, Uttarakhand.

This project plays a critical role in strengthening high-voltage transmission infrastructure and ensuring efficient power evacuation across the region.

Scope of Work

  • Construction of 400KV Transmission Line Infrastructure
  • Tower Erection & Stringing Works
  • Integration with GIS Substation Network
  • Overhead & Underground Line Coordination
  • Testing & Commissioning

Execution Approach

The project is being executed using advanced transmission line construction techniques ensuring structural stability and operational efficiency. All activities are carried out with strict adherence to safety and engineering standards.

Outcome

The project enhances transmission capacity and reliability, supporting seamless power flow across the network and reinforcing Sri Indu Constructions’ expertise in high-voltage transmission projects.

Voltage: 400KV   |   Client: PGCIL   |   Location: Uttarakhand   |   Status: Ongoing   |   Type: Transmission Line Infrastructure